Marty and Cory built many pallets for the molds.
I finished installing the vacuum switch on MP21 robot. I looked through all of the the totes and could not locate any vacuum switches however. I borrowed one from the robot on MP#1 until we can locate more of them.
On MP#0- I completed the lube job and signed off on that.
On #0 and #1 presses, I connected the sled cylinders to the injection carriages. I began routing the cables across and under the machines. While I was up there I noticed that the end of the servo on #0 robot Z-axis has been damaged, probably during shipping? It may still work but I would not trust it.
The other guys finished up at 4:30 and decided to leave so I went with them as there were no other employees here at that time.
Have a great day. Call or comment to the blog if you have questions, etc.
Sean