Wednesday, October 22, 2014

10.21.14 Night Shift Activities

Wired the Mold in #2 with our regular 6 pin connector configuration.

Installed the service call light on Mp#0. It works good, but the mold setter has some concerns that it may too high to get the crane pendant around when he is moving tools around.? I told him I can come back and shorten it if it looks necessary.

Mp#4- Had some issues with a control fuse fail alarm. Found that the tool that went in had a jumper in the 6 pin core plug connector that was causing a direct short. I removed it and replaced the fuse.

Mp#27/28- checked the gender on the cores, changed fittings on #28, and color coded them. They are O.K. to run.

Mp#0-Grinder blew 2 FRS-R-30 amp fuses. I replaced them, and cleared the blades.
also-The pin broke in that tank mold again and the techs wanted to change the robot program to run Vac 2 only so we edited the program and removed all of the related Part Grip 1 instructions in it.

Have a great day!