Worked on the new Van Dorn Installation further.
Changed the 480 receptacles over to our existing style on MP#20 and #21.
I also pulled down the robot cables on #21 so we can be considering how we want to route them along the machine and where we want to run the air to the robot and air gate valve.
Primed the pumps on the other four machines that have oil in them already.
I left two examples of possible 480 covers we can use on Mark's desk to review.
Have a great day!
No comments:
Post a Comment