1.14.15- Night Shift Activities

Mp#10-

Had an issue with the main breaker on the press tripped.  Found Thermolator had a shorted heater. Replaced it with new one and cleaned cooling drain solenoid valves.

Mp#18-

I ran the cables to add on the Oreck 6-pin core box receptacles. They have been routed but are not tied in yet. I will try to finish as time permits, or continue routing cables on the other VanDorns and work around the production schedule.

Mp#12-

Mitch informed me that the material hopper loading system seems to always be calling for material.  We may need to check that out when it goes down next time?

Have a great day!